Sign In | Join Free | My benadorassociates.com
China HORIZON FORMWORK CO., LTD. logo
HORIZON FORMWORK CO., LTD.
HORIZON FORMWORK CO., LTD. Professional manufacturer of formwork and scaffolding systems
Site Member

8 Years

Home > Scaffold Screw Jack >

Hollow Pipe Screwed Swivel Base Jack Painted Surface For Scaffolding Systems

HORIZON FORMWORK CO., LTD.
Contact Now

Hollow Pipe Screwed Swivel Base Jack Painted Surface For Scaffolding Systems

  • 1
  • 2

Brand Name : HORIZON

Model Number : BASE JACK

Certification : SGS

Place of Origin : CHINA

MOQ : 2000 pcs

Price : pls ask HORIZON

Payment Terms : L/C, T/T

Supply Ability : 20000 pcs per week

Delivery Time : 15-25 days

Packaging Details : pallets, bundles, bulk

Material : Q235 steel pipe

OEM : Available

finishing : zinc-plate, hdg, painted

Standard : BS1139

Size : dia 34mm, 38mm, 42mm, 48mm, or tailor made

Application : scaffolding height adjustament

Contact Now

Hollow Pipe Screwed Base Jack and U Head Jack for Scaffolding Systems

1. surface treatment: painted, galvanized
2. Available size: 400mm, 600mm, 700mm, 800mm, or customized size
3. Diameter: 30mm, 32mm, 34mm, 38mm, or customized size
4. Base plate: 120*120*4mm, 140*140*4mm
5: Customized size are available.

Tube size (mm) Base plate (mm) Weight (kg)
Ø30(solid) x 400 120 x 120 x 5 2.90
Ø32(solid) x 400 120 x 120 x 5 3.10
Ø34(solid) x 600 120 x 120 x 5 4.70
Ø34(hollow) x 4 x 600 120 x 120 x 5 2.80
Ø38(hollow) x 4 x 650 150 x 150 x 5 3.70

Widely used in various tubular scaffolding systems.
Galvanized or painted. Customized size is available as per request.

Tube size (mm) Base plate (mm) Weight (kg)
Ø30(solid) x 400 120 x 120 x 50 x 5 2.90
Ø32(solid) x 400 150 x 150 x 50 x 5 4.30
Ø34(solid) x 600 150 x 150 x 50 x 5 4.58
Ø34(hollow) x 4 x 600 150 x 150 x 50 x 5 3.75
Ø38(hollow) x 4 x 650 150 x 150 x 50 x 5 4.50

Widely used in various tubular scaffolding systems.
Galvanized or painted. Customized size is available as per request.


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.

What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.

Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.

HORIZON FORMWORK, your reliable formwork partner!

Hollow Pipe Screwed Swivel Base Jack Painted Surface For Scaffolding Systems
Hollow Pipe Screwed Swivel Base Jack Painted Surface For Scaffolding Systems


Product Tags:

scaffold adjusting screw

      

scaffold leveling jack

      
Quality Hollow Pipe Screwed Swivel Base Jack Painted Surface For Scaffolding Systems for sale

Hollow Pipe Screwed Swivel Base Jack Painted Surface For Scaffolding Systems Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HORIZON FORMWORK CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)